In-Situ Deep Soil Improvement
This proceedings, In-Situ Deep Soil Improvement, contains papers presented at sessions sponsored by the Geotechnical Engineering Division of...

Jet Grouting Gains
Jet grouting, a soil stabilization technology developed in Europe, was introduced in the U.S. in the early 1980s. Due, in part, to the use of inappropriate equipment, jet grouting got...

Specifications for Masonry Structures (ACI 530.1-92/ ASCE 6-92/TMS 602-92)
Specifications for Masonry Structures (ACE 530.1-92/ASCE 6-92/TMS 602-92) is a joint effort of the American Concrete Institute, the American Society of Civil Engineers, and The Masonry...

CenterCore Strengthening System for Seismic Hazard Reduction of Unreinforced Masonry Bearing Wall Buildings
The CenterCore technique of reinforcing unreinforced masonry walls was developed with the help of a National Science Foundation grant in 1984. The CenterCore strengthening system consists...

Roller Compacted Concrete for Embankment Overtopping Protection
In the first National Dam Safety Inventory and inspection performed by the Corps of Engineers, the majority of deficiencies found were related to the inability of the project to retain...

Some Considerations for Remedial Grouting for Seepage Control
The inadequate performance of grout curtains and the consequent need for remedial and supplementary grouting of dam foundations probably arises, in essentially all cases, from a combination...

Reduction of Liquefaction Potential by Compaction Grouting at Pinopolis West Dam, SC
A previous 1984 field study and subsequently published paper (Salley et.al., 1987) described the seismic design background and evaluated the potential success of compaction grouting to...

Remedial Grouting at Calero Dam
This paper describes the design and construction of a remedial grout curtain to resolve a long-standing seepage condition at Calero Dam, located at the south end of the highly-populated...

Ultrafine Cement Tests and Drilling Warm Springs Dam
Ultrafine cement was chosen by the Corps of Engineers for tertiary grouting the Warm Springs Dam because of its ultrafine particle size, low settlement, medium viscosity and longevity....

Evaluation and Rehabilitation of Relief Wells
The U.S. Army Engineer District, Vicksburg has developed an expedient method of rehabilitating arrays of large numbers of gravity flowing relief wells located along the toe of dams using...

A Review of Drilling and Grouting Methods for Existing Embankment Dams
With the increasing emphasis being placed on dam rehabilitation and repair, more dam engineers are faced with the need to interface with drilling and grouting specialists. Regretfully,...

Seismic Stability Modification Designs for Embankment Dams
The Bureau of Reclamation (Reclamation) has recently designed rehabilitations for four embankment dams to ensure their seismic stability. A fifth project is scheduled for construction....

Construction and Verification of Ground Improvements at Mormon Island Auxiliary Dam
Mormon Island Auxiliary Dam, part of the Folsom Dam and Reservoir Project near Sacramento, California, is founded on alluvial materials that were dredged and processed for gold on several...

A Review of Fluid Movement in Compacted Clay: The Case of Macropore Flow
In constructing natural hydraulic barriers to infiltration, a typical design is one founded on the use of layers of compacted clay. Unfortunately, in analyzing the hydraulic performance...

The Influence of Protective Material on Local Scour Dimensions
Protective materials installed around the base of a bridge pier can reduce or prevent local scour. The performance of four materials: grout mats, grout bags, footings, and riprap, are...

Connection of Grouted Tubular Insert Piles to Soil
Force transfer between offshore production jackets and tubular piles is effected by weld bead shear connectors, acting within the grout filled annulus between the piles and pile sleeves...

Sliplining: Design and Installation Considerations for Polyethylene Pipe
The design methodology and installation procedure for polyethylene slipline renewal are discussed. When designing there are two critical phases which must be considered: (1) short-term...

Analysis of Pavement-Pipeline Systems After Cut Restoration
The placement of utility pipes normally necessitates many cuts and fills of the existing pavements. Integrity of pipeline and compatible performance of cut restoration and original pavement...

Application Cases of Slurry Seal in Japan
In Japan, slurry seal began to be used for repairing asphalt pavements at around 1963, mostly for repairs of prefectural and municipal roads. In recent years, however, it has rarely been...

RCC: Rehab Results
Thirty dams have been modified with roller compacted concrete in order to provide additional spillway capacity and for safe overtopping of embankment dams. In the national dam safety inspection...

 

 

 

 

Return to search